![]() |
|
|
Menu Home Links Guestbook Impressum Thermal Collector Project Situation Before Diverse Systems Selected System Other Measures Tips Calculation Lists & Facts Live System Pics Solar Company Terrace Project Before Construction Finished Power Situation Before Power Consumer
|
Solar CompanyHere I would like to send my thanks to "EUT Haustechnik" for the competent consulting and outstanding implementation of the project. The workers worked very properly and fast. They were friendly, prudently, well organized and in addition well prepared. So they had devices like a special transportation cart for the enormous water storage or protection material, in order to avoid damage to tiles or the stairway steps. With much circumspection the water storage was moved into the cellar and connected. Unfortunately I had forgotten to shoot some photos from this action. On the day before the old devices (heating and boiler) had been removed and the "Pardigma" heating had been taken into action provisionally. The assembly of the collector on the roof still took up a few days then, because the team wanted to wait for a fair weather period. After installation Mr.Franke kept e-mail contact to me and he answered a lot of my questions. The programming of the controller and adjusting the parameters were done in three visits. So the system was adapted to our energy using behaviours. Stand: 15.8.07
|